Description
MTS Consulting were commissioned to provide a complete package on all building services covering full designs, tendering process, supervision of works and certification of works.
MTS Consulting have also designed the sister terminal at Cirkewwa, joining the two main Maltese Islands. Shores supplies needed for the Gozo Channel ferries were part of the design of this terminal apart from the rest of the backing infrastructure.
M&E Value: €1,500,000
Construction Period: 12 months
MTS Consulting have also designed the sister terminal at Cirkewwa, joining the two main Maltese Islands. Shores supplies needed for the Gozo Channel ferries were part of the design of this terminal apart from the rest of the backing infrastructure.
M&E Value: €1,500,000
Construction Period: 12 months